IOT PILOT EVIDENCE WORKSHEET ============================ Purpose and decision -------------------- Operational question: Decision the pilot must support: Named decision owner: Pilot start and end dates: Observation contract -------------------- Physical condition being observed: Expected observation schedule or independent event log: Message schema and version: Observation time source: Maximum useful delay: Rules for invalid, duplicate, late, stale, and missing data: Installation record ------------------- Device identifier: Asset or location: Hardware and firmware version: Mounting, enclosure, orientation, and regional configuration: Installer and installation date: Results (use the same denominator throughout) ------------------------------------------------ Expected observations: Distinct observations received: Valid observations: Valid observations received within the agreed deadline: Invalid observations: Late observations: Missing observations: Duplicate records (reported separately): Controlled failure checks ------------------------- Test case: Expected behavior written before the test: Observed behavior: Evidence retained: Owner of corrective action: Retest result: Operations and exit ------------------- Who investigates silence or invalid data: Who acknowledges and resolves alerts: Support period and update process: Export format, row count, identifiers, units, and timestamps checked: Account removal and device return or reassignment plan: Decision -------- What was demonstrated and under which conditions: Open requirements or limitations: Decision: accept / revise scope / run another test / reject Decision owner and date: This worksheet is an independent educational aid. Adapt it to the actual product, operating risk, legal requirements, and authorized test environment.